Green Diesel Days

£15.99
Or
STOCK:
Available
We currently have 0 in stock.

If this item is out of stock it will take around 4 week(s) for us to obtain a copy if you order today. Thanks

Stock Code
A9453.0
A9453
The 1955 Railway Modernisation Plan provided for the introduction of 2,500 new diesel locomotives, with initial orders for 171 examples, to replace steam locomotives on Britain's railways. The Modernisation Plan was the death knell for steam traction, arguing that dieselisation should take place as quickly as the new locomotives could be built. In 1956, for the first time, more diesel locomotives were built than steam. However, several of the Pilot Scheme orders were for batches of ten or twenty machines, without a prototype, a decision that BR would later come to regret. Maintenance and reliability would be problems for these early diesel locomotives. Most coaching stock in use in the late 1950s did not allow for electrical train heating, so boilers had to be fitted to the locomotives to heat the carriages, which in turn caused weight problems.This book takes a look, in full colour, at the green diesel days on Britain's railways as steam was being phased out.
More Information
Stock Code A9453.0
Author Huntriss D
ISBN13 9781445694535
Format Softback
Height(mm) 234
Width(mm) 165
Page Count 96
Pictures 180
Publication Date 5 Aug 2019
Publisher AMBERLEY PUBLISHING
Publication Status Available
Record last updated 14/09/2023